|
|
4 |
|
Spartan: An Approach to Software and Systems Engineering Process Assessment |
|
|
J. Holt, Brass Bullet Ltd/Major Projects LUL |
| 5.6 Tools and Integration Database Use I |
|
|
1 |
|
Towards a Standardised Systems Engineering Information Model |
|
|
E. Herzog, A. Tome, Real-Time Systems Laboratory |
|
|
2 |
|
MIST- A Measurement Tool Database |
|
|
W.H. Farr, J.R. Crigler, Naval Surface Warfare Center Dahlgren |
|
|
3 |
|
The Future Systems Engineering Data Exchange standard STEP AP-223: Sharing the |
|
|
results of the SEDRES Project |
|
|
J. Johnson, British Aerospace Military Aircraft & Aerostructures |
|
|
4 |
|
The Design, Implementation, and Management of A Systems Engineering Database |
|
|
R. Collins, Entelecheia Limited, L. North, Archer Communications Systems Limited |
| 5.7 Integrating Risk Factors II / PANEL: Risk Management |
|
|
1 |
|
Information Security Risk Management for Systems Engineers |
|
|
T. Gauvain, C. Adams, L-3 Network Security Systems (Europe) |
|
|
2 |
|
Systems Engineering Applied to Integrated Safety Management for High Consequence |
|
|
Facilities |
|
|
R.H. Barter, Lawrence Livermore National Laboratory, |
|
|
B.G. Morais, Synergistic Applications, Inc. |
| 6.1 PANEL: Integrated Process Improvement and Acquisition Reform at the FAA |
| 6.2 Collaborative Working |
|
|
1 |
|
Creating a Collaborative Systems Engineering Environment |
|
|
M. Sampson, TD Technologies, Inc. |
|
|
2 |
|
Function Analysis and Decomposition Using Function Analysis Systems Technique |
|
|
J.R. Wixson, Lockheed Martin Idaho Technologies Company |
|
|
3 |
|
Systems Engineering the Product Development Value Stream |
|
|
S. I. Weiss, J.M. Warmkessel, Massachusetts Institute of Technology |
|
|
4 |
|
Simulation Based (Systems) Engineering or Collaborative Based Acquisition |
|
|
R.C. Zittel, U.S. Department of Defense |
| 6.3 Adapting SE Processes |
|
|
1 |
|
Tailoring Quality Function Deployment for Use in Systems Engineering |
|
|
C. Plowman, Lockheed Martin Idaho Technologies Company |
|
|
2 |
|
"Simple Simon Met A System" - Bridging the Gap to the Rest of the Organisation |
|
|
H.G. Sillitto, Pilkington Optronics |
|
|
3 |
|
Tailored Risk Management - A Successful Application to a Major Program |
|
|
J.A. Palmer, United Defense LP |
|
|
4 |
|
Tailoring Generic Systems Engineering Processes: An Agent-Oriented Method |
|
|
J. Murdoch, J.A. McDermid, University of York, P. Wilkinson, Rolls-Royce PLC |
| 6.4 PANEL: Scenarios for System Requirements Engineering: the CREWS |
| 6.5 Systems and Software Engineering II |
|
|
05 March 1999 | Page 8 of 12 |
Previous Next Last
Page 8.